How Do You Find Land for Solar and Battery Storage Farms?

There is a growing demand for renewable energy production, and developers are looking for solar, wind, and battery storage. However, finding the right site compatible with the renewable energy project is challenging. Moreover, certain data sets must be assessed to identify, analyze, and locate source off-market sites.


Here’s how to find the perfect land to focus on solar and battery storage farms.


  • Get access to DNO data

DNO is Distribution Network Operator data that provides detailed insight into the site-sourcing industry. This tool helps you to get information about suppliers, operators, substations, line voltage, towers, tower voltage, powerline, etc. All this valuable information would help developers make an informed decision about site selection, grid integration, infrastructure planning, cost-effectiveness, and project efficiency.


  • Filtering sites by distance from the substation

You can use a sourcing tool to identify land a specific distance from the substation and power line. If the land is close to the substation, energy loss during transmission will be reduced. It would also ensure efficient energy distribution from the solar and battery storage to the grid.


  • Accessing headroom rating and voltage group data

You learn about the substations with headroom capacity to understand how much additional energy supply can be accommodated. Integrated the farm with a grid and contribution to power sustainably. To understand the existing infrastructure, you would also get information on voltage group data of nearby power lines and power taps.


  • Selecting terrine and panel direction

When a land manager inspects a solar farm plot, he must understand in which direction the panels can get the most sun exposure. Based on that, the panels are placed close together. You also filter land based on terrain and slope angle to achieve optimal productivity.


  • Sourcing the right-sized plot

Building a solar and battery storage farm requires a larger plot than residential projects. The plot size varies between 15 and 30 hectares. It would help if you chose the plot based on the percentage of build-up area and other ideal opportunities.


  • Navigating through local policies

Navigating local policies can become very challenging, but the process can be simplified with proper information about the local planning regulations. Choose a platform to help you find land that aligns with the policies, including sites unsuitable for housing.

  • Evaluate and filter planning constraints

When developing a solar and battery storage farm, you must be cautious about the planning constraints, such as whether the area is flood-prone, a protected ecosystem, or part of a heritage site.


  • Locate sites to power commercial areas

You can use specific tools to help you locate land near commercial zones. This is an excellent approach for renewable companies to get a direct power supply to commercial consumers so that developers can profit from optimizing energy distribution.


  • Finally, contact the land owner directly

To streamline the communication process, you should contact the land owner directly for site acquisition or leasing purposes. You can also send letters to the neighbors to inform them of the scheme and ask them to collaborate with the solar and battery storage farm development. 


For a more comprehensive approach, you can go through Inthequeuellc.com. Working with an expert helps refine and smooth the process for faster outcomes.